← All FAQs
pricing-and-pilots
How long does a pilot take?
Typical pilot duration is 2 to 3 months. Integration setup (SMART on FHIR or EDC) takes days to a week. The remaining time is structured grading, paired-grader timing studies, query reduction measurement (for CRO and Phase 1), and attribution consistency review (for pharma). Pilot completion produces a measurable outcome report that supports the enterprise procurement decision.